Gas Act, 2001 (Act No. 48 of 2001)

Rules in terms of the Gas Act, 2001

Annexures

Annexure B : Form: Application for a licence

Chapter 3 : Details of Application

Operation of Gas Storage Faciltiy (GALA.s.F3)

Purchase cart Previous page Return to chapter overview Next page

 

Each numbered item below should be copied and appear at the top of a page with your information below.

 

Provide the following information:

 

1.A description of the gas storage facility and key design codes to demonstrate the technical feasibility, adequately specifying the site layout of the proposed facility and the physical dimensions thereof. This must include:
(a)detailed drawings, including process flow diagrams; mechanical drawings and plant layout;
(b)the location of each storage tank within the facility;
(c)the effective storage capacity of each tank;
(d)design pressure for each tank and for the facility;
(e)maximum and average operating pressures for each tank and for the facility;
(f)design gas f10wrates (nm3/h and GJ/h) for each tank and for the facility;
(g)maximum and average operating fIowrates (nm3/h and GJ/h) for each tank and for the facility; and
(h)where injection of storage tanks occurs off-site, provide the information required in (e), (f) and (g) above for the injection process and the location of the site.

 

2.Details of the gas filling and withdrawal processes for the facility.

 

3.Proof of financial viability of the facility, including:
(a)commercial structure;
(b)proposed or actual (if already operating) financial statements and/or discounted cash flow (DCF) model (providing assumptions used in calculations and sourcing of figures);
(c)the status and/or proof of equity financing agreements and finance including terms and conditions;
(d)other incidental costs (please specify whether legal, consulting etc) ; and
(e)tariffs to be charged for the facility and details of the methodology used for these calculations.

 

4.Details of any existing and/or potential customers for the facility, including:
(a)the names and physical addresses of existing customers,
(b)the names and physical addresses of potential customers,
(c)the categorization of each customer, for example, as a distributor, power generator or large user; and
(d)for each customer, the average or anticipated gas consumption in Gigajoules per annum.

 

5.Copies of all existing gas storage agreements, where applicable.

 

6.A description of the proposed allocation mechanism in terms of which third party access will be granted to the proposed facility, including:
(a)grounds for refusal of access; and
(b)measures to ensure non-discrimination between customers.

 

7.Details of any additional planned investments or upgrading of each facility and the schedule of implementation. Provide timelines for service commencement for each item listed where applicable.

 

8.A copy of the maintenance policy for the storage facility.