Labour Relations Act, 1995 (Act No. 66 of 1995)NoticesBargaining Council for the Metal and Engineering IndustriesExtension of the Consolidated Main Collective Agreement to Non-parties (for the period 1 July 2021 to 30 June 2024)Part 24. Technical SchedulesSchedule E/3Wage Rates Applicable to Operations Scheduled in Schedule E/3 are Prescribed in Clause 3(a) of Part II of this agreementSection (b): Installation SectionSubsection (b)(iii): Ductwork |
RATE AA
1. | Marking out with tape and/or rule of centres and working lines of articles and/or material preparatory to cutting out. |
2. | Setting out of stock on floor or on bench to sketch and/or drawings and/or dimensions. |
3. | Erection of manufactured and/or fabricated ductwork and/or associated articles from drawings using a tape measure (n.e.s.). |
4. | Modifying and cutting back of straight pre-manufactured ducts, excluding final connecting. |
RATE D
1. | Marking off of duct sections to given lengths for cutting off purposes, using only length gauges and/or tape measure and/or templets and marking material. |
2. | Marking and affixing of hangers from predetermined duct run positions (excluding use of explosive tools). |
3. | Erection of ducting and associated articles to predetermined positions under supervision of a Rate AA employee. |
4. | Cutting in and fixing of branches and spigots to predetermined positions. |
5. | Erection and affixing of fire dampers, volume dampers, attenuators, canvas connections, in-line coils and in-line fans to premarked positions under supervision of Rate AA employees. |
6. | Fixing of dampers, grilles, diffusers, constant volume boxes, fan air terminals and other air terminals to pre-marked positions (excluding setting out). |
RATE G
1. | Assisting Rate D employees on fixing of dampers, grilles, diffusers, constant volume boxes, fan air terminals and other air terminals. |
2. | Repetition hand riveting (10 mm diameter or less). |
3. | Erection of flexible connections between spigots and air terminals. |