Provide the following information/documentation. Each numbered item below should be copied and appear at the top of a page with your information below.
1. | A technical description of the loading facility, including: |
(b) | the number of loading points; |
(c) | type of each loading point (e.g. loading arms or flexible hose); |
(d) | details of the proposed pipeline to be connected to the storage facility including: |
(iv) | receipts and delivery points |
2. | Maps and diagrams where appropriate. The maps should give details of capacities at the various stages of development, planned and potential receipt and delivery points. These should also include the rate at which petroleum can be conveyed through the loading facility and the time necessary for ships to be brought into position for loading, and the dimensions and capacities of any auxiliary pipelines connected thereto; |
3. | A copy of the agreement or authorisation from the National Ports Authority permitting the operation of the facility on its property, where appropriate. |
4. | Provide information required in terms of rules 12(7) and 12 (8) of these Rules. |
5. | A copy of the loading facility operational procedure. |
6. | Status in terms of the National Key Points Act, 1980 (Act No. 102 of 1980). |
7. | Details of security arrangements. |
8. | Details of the development programme including: |
(a) | planned capacity of the project during the various stages of development; |
(b) | the schedule of implementation and minimum investment commitments for the development programme; and |
(c) | the deadline to commence service for each stage contemplated. |
10. | A copy of the maintenance policy for the loading facility. |