An application for the issuing of a production certificate, or an amendment thereof, shall be—
(a) | made in the prescribed form and manner ; and |
(i) | the appropriate fee as prescribed in Part 187; |
(ii) | data describing the inspection and test procedures necessary to ensure that each article produced conforms to the type design and is in a condition for safe operation; |
(iii) | a description of inspection procedures for raw materials, purchased items, and parts and assemblies produced by any partner or subcontractor, including methods used to ensure acceptable quality of parts and assemblies which cannot be completely inspected for conformity when delivered by the partner or subcontractor to the applicant; |
(iv) | a description of the methods used for production inspection of individual parts and complete assemblies, including— |
(aa) | the identification of any special manufacturing processes involved; |
(bb) | the means used to control the processes; |
(cc) | the final test procedure for the complete product, and |
(dd) | in the case of an aircraft, a copy of the applicant's production flight test procedures and checkoff list; |
(v) | an outline of the materials review system, including the procedure for recording review board decisions and disposing of rejected parts; |
(vi) | an outline of a system for informing the personnel responsible for inspections of current changes in the engineering drawings, specifications and quality control procedures; |
(vii) | a list or chart showing the location of all inspection stations; and |
(viii) | the terms of approval referred to in regulation 21.07.4, for which application is being made. |